Spring 2024 Renovation Projects

April Projects
Pool gate lock repair Complete
Compactor room concrete removed and poured Complete
Garage lobby tile removed and floor pumped up Complete
Concrete by garage lobby/compactor room pumped up Complete
New photo sensor replaced in garage Complete
Dryer vent cleaning floors 1-8 Complete
Roofing company follow up items Complete
Interior pest control Complete
Voluntary HVAC cleaning
Complete
Dryer vent cleaning floors 1-8 Complete
Wallpaper removed and painting in lobby (for now) Complete
Garage painting Complete
Pool deck cracks filled and painted Complete
Lobby Driveway Pavers April/May In Process
The garage lobby will be worked on after the front lobby is completed

Driveway Paver Photos Are In Chronological Order By Date.

4/10/2024 Lobby Driveway Ceiling Washed and Ready For The Pavers.

 

4/12/2024 Paver Driveway Project Has Started.  The Driveway Needed To Be Fixed Due To Settling and A Safety Issue With The Ramp Coming Out Of The Lobby.  The Pavers Will Update The Look And  Modernize The Entrance.  The Driveway and Sidewalk Will Be All One Level.

 

4/12/2024 Heavy Machines Needed For This Project Due To Extra Thickness Of The Concrete

 

4/12/2024

 

4/12/2024 Demo Moving Along

 

4/12/2024 Extra Thick Concrete 7-8″

 

4/12/2024 Great Progress Today

 

4/12/2024 End Of Day One

 

4/15/2024 Day Two With Great Progress.  Both Sidewalks Are Demoed and Hauled Away. Remainder Of Driveway Removed.

 

4/15/2024 End Of Day Two

 

4/16/2024 Day Three. Driveway and Sidewalk All Removed.

 

4/16/2024 End Of Day Three. The Sidewalk Was Removed & The Landscaping Will Continue To Our Building.  This Photo Is Taken From The Embassy Side Of The Building.

 

4/18/2024 Making Progress

 

4/18/2024 End Of Day Four.  All Base Was Spread & Leveled.  2 More Truck Loads Tomorrow.

 

4/20/2024 End Of Day 6 With Most Of The Fill Completed & Base Tamping

 

4/25/2024 Pavers Have Been Delivered And Tamping Is Complete.

 

4/25/2024 Pavers Are Scheduled To Laid On Monday.

 

4/25/2025 Project Moving Along As Scheduled

 

4/27/2024 This Will Be The Paver Pattern Side To Side. There Will Be No Raised Sidewalk.

 

5/6/2024  Laying of The The Pavers Has Started!!!

 

5/6/2024 All Hands On Deck

 

5/6/2024

 

5/6/2024 Starting On The North Hampton Side.  Click Photo To Enlarge

 

5/6/2024 Click Photo To Enlarge

 

5/6/2024 End Of The Day Progress Click Photo To Enlarge

 

5/7/2024 Start Of Day Two

 

5/7/2024 Sturdy Pavers That Allows Heavier Vehicles Along With Cars.  Click Photo To Enlarge

 

5/7/2024 5/7/2024 Earth Tones For a Timeless Contemporary / Traditional Look.

 

5/7/2024 End Of Day Click Photo To Enlarge

 

5/8/2024 Entrance To The Lobby Driveway

 

5/8/2024 Driveway Entrance

 

5/8/2024

 

5/8/2024 End Of Day

 

5/10/2024 Last Two Days Progress

 

5/10/2024

 

5/10/2024 This Triangle Shape Will Lead Into The Mulched Bed That KPMA Will Do

 

5/10/2024 End Of The Week Progress.  Looking For Completion Beginning Of Next Week, Hopefully.   The Will Finish Up The Edges Side To Side And Then Sand Between The Pavers.

 

5/14/2024 Last Day Of Pavers Install

 

5/14/2024 Hoping To Add Some Dimension To This Wall Around The Door

 

5/14/2024 Words Homeowners Have Used To Describe The Paver Project Has Been Gorgeous, Classy and Tasteful.

 

5/14/2024 End Of Day. Couple More Things To Do On This Project Is Finish The Bottom Of The Wall And Possibly Have A Feature On The Opposite Wall Of The Lobby Door…. VIDEO

 

5/3/2024  The Electrical Has Been Fixed And The Gate Lever To Enter Was Turned Around So The Latch Is Next To The Key Code. The Holes From The Previous Screws Have Been Filled And The Gate Is Painted.

 

4/27/2024 The Compactor Room Plumbing Has Been Fixed Due To Settling. The New Concrete Will Be Poured Next Week.

 

5/3/2024 New Concrete Has Been Poured.

 

5/3/2024 Compactor Room Has Been Completed

 

4/6/2024 Garage Lobby Floor Project
Areas in the garage lobby, compactor room and surrounding areas have been fixed due to major settling.  When the tile was laid in the garage lobby there was already settling and cracks but were never addressed.

Posted 4/6/2024 Chipping Out Tile Before Pumping Up The Floor. New Concrete Will Be Poured in the Compactor Room and Garage Floor Surrounding the Garage Lobby.

 

 

 

Very Uneven Floor With Major Settling.

 

Large Gap From Settling.  The Other Side of That Wall Is The Garbage Compactor Room Which Will Have New Concrete Poured In A Couple Of Weeks.

 

Many Gaps Under Tiles Throughout The Floor.

 

Notice The Height Difference Of The Floor and Walls.  It’s a Little Deceiving Since The Wall Has Settled Also.

 

From Left To Right Is How Much The Floor Has Settled. The Large Black Line Area Is a Patch That Was Used Instead Of Fixing The Large and Deep Crack Of The Sinking Floor.  The Floor Has Settled Over The Years With Patching Done and There is Definitely a Slope From Left to Right.  The Tile On The Right Had Very Thick Leveler To Make Up The Difference Of The Uneven Sinking Floor.  When This Tile Was Installed The Settling & Cracks Were Not Addressed, Instead A Patch and Leveler Was Used.  All The Issues With That Floor Will Be Addressed When It Is Pumped Up.

 

The Tape Measure Says It All.  This Photo Was Taken Of The Left Back Corner Coming Out Of The Elevator.

 

This Settling Photo Is On The Left Wall Corner Going Out The Sliding Door.  I Was The Clean Up Girl and Helped With Traffic Control So There Was No Need To Shut Down The Elevator.  The Project Ran Pretty Smooth.  And Yes, I Did It In Flip Flops.  Hahaha

 

4/18/2024 Garage Elevator Lobby Pumped Up. No Elevator Shut Down and Project Ran Smooth

 

4/18/2024 Back Left Corner Coming Out Of Elevator.

 

4/18/2024 The Drill Was About The Size Of A Dime. Project Went Well & Was On Time.  After The New Concrete Is Poured In The Compactor Room, The Garage Lobby With Be Worked On.